Manufacturing

Corvo predicts parts shortages two weeks earlier

Corvo predicts parts shortages two weeks earlier

A forecasting model on top of Corvo’s ERP data warns planners about shortages before they stop the line.

2 wks

Earlier shortage warnings

31%

Fewer stockouts

$1.2M

Inventory freed up

Client

Corvo Manufacturing

Industry

Manufacturing

Services

Data, Automation

Timeline

14 weeks

The challenge

Corvo builds industrial pumps from more than 4,000 parts. Planners found out about shortages when the line stopped, and kept extra stock everywhere to stay safe.

What we built

We cleaned three years of ERP and supplier data, then trained a forecasting model that flags risky parts two weeks ahead. Planners get a short daily list instead of another dashboard.

  • A data pipeline from the ERP and supplier portals

  • A shortage forecast with a plain-language reason for every alert

  • Automatic purchase suggestions for approval

The result

Stockouts fell by 31% and Corvo released $1.2M in safety stock. Planners now act on warnings two weeks earlier than before.

“

The model tells us what is about to go wrong and why. Our planners went from firefighting to actually planning.

Erik Sandvik

Supply Chain Director, Corvo

Sagen Sie uns, was ansteht.

Standort, Umfang, Zeitfenster — mehr brauchen wir nicht für den Anfang. Sie bekommen ein verbindliches Angebot mit Preis und Zeitplan, keinen Rückruf-Termin.

Lieber telefonieren?

+49 30 424 3333 0

kontakt@fercon.net

Sagen Sie uns, was ansteht.

Standort, Umfang, Zeitfenster — mehr brauchen wir nicht für den Anfang. Sie bekommen ein verbindliches Angebot mit Preis und Zeitplan, keinen Rückruf-Termin.

Lieber telefonieren?

+49 30 424 3333 0

kontakt@fercon.net

Sagen Sie uns, was ansteht.

Standort, Umfang, Zeitfenster — mehr brauchen wir nicht für den Anfang. Sie bekommen ein verbindliches Angebot mit Preis und Zeitplan, keinen Rückruf-Termin.

Lieber telefonieren?

+49 30 424 3333 0

kontakt@fercon.net